OEM & Custom
Start with a drawing, sample or reference number. Agree on the mating interfaces, test conditions and sample approval before setting production quantities.

From drawing to production
Share the application
Identify the vehicle, part family and reference number. Include the current drawing revision or photographs of a sample.
Review the interfaces
Engineering reviews the mating parts, dimensions, material specification and required performance with your team.
Agree on the sample plan
The quotation sets out the tooling, sample scope, quantities and proposed timing for your project.
Approve the sample
Compare the sample and its agreed inspection results with your drawing. Record any revisions before production.
Confirm production and packing
Agree on the release quantity, protective packing, batch identification and delivery details.
If the drawing is still in progress
Send the part number or describe the sample. Mark any dimensions that must stay fixed and identify the mating components. Those details help the team identify what it needs to measure next.
Find your product familyQuestions before requesting a quote
- Can I start with a sample?
- Include an overall photo with a scale and close-ups of both interfaces. Flag worn splines, damaged bushes or bent sections so the original geometry can be checked against a drawing or an intact mating part.
- How do I compare quotations?
- List the bare part and accessories separately. Ask for tooling, samples, production quantities and packaging on separate lines, using the same drawing revision for each quotation.
- What defines sample acceptance?
- Identify the dimensions that control fit and agree how stiffness will be measured. For a fatigue test, specify the fixture, load range, cycle count and acceptance criteria before testing begins.
Handling a drawing revision
When a sample or drawing changes, identify the previous revision and highlight the affected dimensions. State whether the change applies to the next sample, production parts or both. Keep the matching inspection requirement with the revised feature.